Plugin

Reckless Wah

v1.4.9

A wah built from a tuned LCR circuit, moved by your playing, by an LFO in time with the song, or by an expression pedal over MIDI.

The Reckless Wah plugin panel.

From the user guide

Modes and filters

Mode chooses what moves the wah; you can switch it while playing.

The screen: the wah's peak moving between the heel's curve and the toe's.
The screen: the wah's peak moving between the heel's curve and the toe's.
  • Autowah — a picked note opens the wah and it closes as the note dies. Key at Sidechain follows another track instead, which is never heard.
  • LFO Wah — rocks heel to toe and back once per Rate, locked to the bar while the song plays. The first knob becomes Depth.
  • Wah — an expression pedal on MIDI CC 1, any channel. In a host, route MIDI to the plugin; in the standalone app, turn the input on in the Audio/MIDI Settings (the gear beside PRESETS). The pedal's position is saved with the session and in presets.

Filter chooses what is swept: Wah, the tuned circuit; Lowpass, a four-pole resonant synth filter; Phase, a four-stage phaser. Any mode moves any filter.

The plates: MODE, KEY, RATE and FILTER.
The plates: MODE, KEY, RATE and FILTER.

Controls

Close-upControlRangeDefaultWhat it does
Mode (plate), close up on the Reckless Wah.Mode (plate)Autowah / LFO Wah / WahAutowahWhat moves the wah.
Sensitivity, close up on the Reckless Wah.Sensitivity0 to 100 %70 %Autowah: how easily your playing opens the wah.
Depth, close up on the Reckless Wah.Depth0 to 100 %100 %LFO Wah: how far up from the heel it sweeps.
Low Freq, close up on the Reckless Wah.Low Freq50 Hz to 10 kHz300 HzThe frequency at the heel, where the sweep starts.
High Freq, close up on the Reckless Wah.High Freq50 Hz to 10 kHz2 kHzThe toe. Below Low Freq the sweep runs downward; equal, it stands still.
Resonance, close up on the Reckless Wah.Resonance0 to 100 %50 %How resonant the chosen filter is. 50 % is the stock wah.
Output, close up on the Reckless Wah.Output-24 to +24 dB0 dBOutput level; take back what a sharp peak adds.
Key (plate), close up on the Reckless Wah.Key (plate)Input / SidechainInputWhat the Autowah listens to. Dimmed in the other modes.
Filter (plate), close up on the Reckless Wah.Filter (plate)Wah / Lowpass / PhaseWahWhat the sweep moves.
Rate (plate), close up on the Reckless Wah.Rate (plate)2/1 to 1/16 (with dotted and triplet values)1/4LFO Wah: one sweep up and back, as a note value.
CC 1 (MIDI), close up on the Reckless Wah.CC 1 (MIDI)0 to 1270Wah mode's pedal: 0 the heel, 127 the toe.

Tips

  • Start here: a clean guitar, the defaults, a funky rhythm. Set Sensitivity so your normal playing opens it as far as you want.
  • The cocked wah: in Wah mode, park the pedal mid-way for a fixed, nasal voice.
  • Drums moving a guitar: Autowah, Key at Sidechain, the drums sent to it.
In LFO Wah the first knob is Depth.
In LFO Wah the first knob is Depth.

← All 22 plugins